To set up a preventive maintenance schedule, list every recurring task in each building, give each task an interval taken from the source that sets it (the manufacturer, the code, the season, or the service contract), name who does it, and set its first date. Then have each task open its own job on that date, so the closed job is the record that the work was done.
Your buildings already get serviced. The boiler contractor comes before the cold, the elevator company comes on its contract, someone changes the filters, and the fire inspection is booked when the letter arrives. That schedule exists. It is kept in a calendar, a spreadsheet tab, and the memory of whoever has run the building longest, and it holds while that person is at their desk. What it has no way to do is notice a miss. A service that is skipped breaks nothing on the day it is skipped.
What a preventive maintenance schedule is
Preventive maintenance is work done on a schedule to keep a building's systems from failing, as opposed to reactive maintenance, which repairs them after they fail. A preventive maintenance schedule (often written "preventative", and also called a planned or routine maintenance schedule) is the list of that work with three facts beside each task: how often it is done, who does it, and when it is next due.
Canada Mortgage and Housing Corporation (CMHC) describes it the same way. Its Operations Manual for Owners and Managers of Multi-Unit Residential Buildings (revised 2017) tells owners to create a schedule that lists every maintenance task, how often each one is done, and who is responsible for it. The manual's master checklist is built on those three facts: each task is a row, one column says whether the property manager, the site staff, or a contractor does it, and twelve more columns mark the month it falls in. The rows are grouped by how often they repeat, from daily to once a year.
A schedule is narrower than a maintenance plan. The plan sets the year's priorities and budget, and the schedule is the dated list that carries it out. Whether running one takes specialized software is a separate question, answered in CMMS for Residential Property Management: Do You Need One?. The daily rounds and the records a staffed lobby keeps are covered in Front Desk Operations for Residential Buildings.
What goes on a residential preventive maintenance checklist
A residential preventive maintenance checklist covers eight groups of work. The table lists the typical recurring tasks in each group, who usually does them, and what sets the interval. Read it against your own buildings: a building with no elevator or boiler skips those rows.
| Building system | Typical recurring tasks | Who usually does it | What sets the interval |
|---|---|---|---|
| Heating and cooling | Filter changes; pre-season service of boilers, furnaces, and air conditioning | Site staff for filters; a mechanical contractor for service | The manufacturer and the season |
| Fire and life safety | Smoke alarm tests; inspections of fire alarms, sprinklers, and extinguishers | Site staff for routine checks; a fire protection contractor for inspections | The fire code your jurisdiction has adopted |
| Elevators | Maintenance visits and periodic safety inspections | The elevator contractor | The service contract and the local elevator authority |
| Plumbing and water | Water heater service; backflow preventer tests; drain and sump pump checks | A plumbing contractor; site staff for checks | The manufacturer, and the water utility or plumbing code |
| Roof, envelope, and drainage | Roof inspections; gutters and downspouts; caulking and sealants | A roofing contractor; site staff | The season and the roof warranty |
| Grounds and exterior | Landscaping; snow clearing; irrigation start-up and shut-down | A grounds contractor or site staff | The season and the service contract |
| Common areas | Pest control; lighting checks; garage doors; laundry equipment | A pest control contractor; site staff | The service contract and your own repair history |
| Inside the units | Periodic unit inspections; filter and alarm checks; move-in and move-out inspections | Site staff or the property manager | Your own policy, the lease, and local entry rules |
CMHC's master checklist shows the same split in practice. In its monthly group, site staff check every fire extinguisher and replace forced-air filters, while a contractor handles pest control and elevator maintenance. The manual's advice on who does the work is plain: most structural, mechanical, and electrical maintenance belongs with contractors who specialize in it, and the owner's job is to choose them, set the schedule, and see that the work is done on time.
Where each preventive maintenance interval comes from
A preventive maintenance interval is borrowed from whoever is accountable for the equipment or the rule. Each task on the schedule takes its interval from one of five sources.
- The manufacturer. The equipment manual states the service interval, and a warranty can depend on following it. Filters are the common case: ENERGY STAR's maintenance checklist for heating and cooling equipment says to inspect, clean, or change air filters once a month.
- The code and the authority that enforces it. Fire alarms, sprinklers, extinguishers, elevators, boilers, and backflow preventers are inspected on cycles set by the codes your jurisdiction has adopted. Take each due date from your last inspection report or certificate. For the alarms inside a home, the U.S. Fire Administration's smoke alarm guidance says to test them every month.
- The season. Weather sets the deadline, and the work has to land before it. ENERGY STAR recommends a contractor's check-up once a year ahead of each season, the cooling system in the spring and the heating system in the fall, since contractors' calendars fill once summer and winter arrive.
- The service contract. Elevator maintenance, pest control, landscaping, and cleaning repeat on the visits a contract promises. Put those visits on the schedule, so a visit that does not happen shows up as an open job.
- Your own repair history. Where nothing else sets an interval, the record does. A drain that has backed up twice in a year is telling you how often to clear it.
Write the source into the task itself. A note such as "monthly, per the manufacturer's manual" tells the next person why the interval is what it is, and where to look when it changes.
How to create a preventive maintenance schedule, step by step
Creating a preventive maintenance schedule takes eight steps. The first six are done once for each building, and the last two keep the schedule running.
- List what recurs in each building. Walk the building with the table above and write one line per task: the system, the task, and the building it belongs to.
- Collect the documents that set the intervals. Pull the equipment manuals and warranties, every service contract, the last inspection reports and certificates, and any maintenance terms in the insurance policy or the management agreement.
- Set each interval from its source. Enter the interval the document gives and note the document beside it. Where no document sets one, start from your repair history and adjust.
- Name who does each task. Assign your own staff or a named contractor, one per task, and record the contractor's trade so a replacement is easy to find.
- Anchor each task to a date. Choose the first date, then the weekday or the day of the month it repeats on. Seasonal work gets a date ahead of its season.
- Write what done means. Put the steps, what to check, and the proof to attach (a service report, a photo, or a certificate) into the task's description.
- Have each task open its own job. Set the task to create a work order or a staff task on its date, already carrying its instructions and its assignee, so nothing waits for someone to create it.
- Review the schedule every quarter. Read what closed, what is overdue, and which intervals the record says to change. CMHC's maintenance planning guide, written for First Nation housing managers, suggests reviewing a maintenance plan at least once every three months.
Recurring maintenance without a whiteboard
Recurring maintenance kept on a whiteboard, a shared calendar, or a spreadsheet has one limit in common: each of them can show that a task is due, and none of them can act on it. A calendar entry is a prompt for a person to create the job, find the contractor's number, and remember afterward to write down that the work happened.
A recurring work order closes that gap. A recurring work order is a work order that files itself on a schedule, already carrying its instructions, its building, and its contractor. The prompt and the job become one record: it opens on its date, it stays open until someone closes it, and once closed it is the proof. A task your own staff handle works the same way, as a recurring task assigned to a person instead of a contractor.
How Scaalr runs a preventive maintenance schedule
In Scaalr, each line of a preventive maintenance schedule is a recurring schedule that files either a work order or a case. A work order is the job for a contractor, and a case is the task for your own team. You set the title, the description, the priority, and the building once, and each one is filed with them; a recurring case also keeps its unit.
A schedule repeats weekly, every few weeks or months, quarterly, or yearly, on the weekday or the day of the month you choose, and it runs until a date, for a set number of times, or until you end it. The form shows the next dates before you save and asks whether to file the first one now or wait for the first scheduled date.
A recurring work order names its contractor from your contractor directory, where each contractor has a trade and your preferred ones are flagged and ranked. Each work order is filed with that contractor attached and notified by email, along with anyone else you chose to notify, and the contractor's email replies thread back onto it. Scheduled work reaches its contractor because the schedule names them. Automatic dispatch, on Growth and up, is a second route to the same bench for new cases in the categories you map to a trade, and it is covered in Automatic Contractor Dispatch: Which Cases Leave on Their Own.
The Recurring Schedules page lists every recurring work order and case with its next date, its cadence, its building, its contractor, and its state: Active, Paused, or Ended. It flags a schedule whose contractor or saved contact can no longer be notified. A schedule can be paused for the off season and resumed, ended, or run early when the work is needed now, and the recurring switch on a work order or case page pauses and resumes its schedule too.
The closed jobs become the record. A building's page has a tab for its work orders and a tab for its cases, a contractor's page lists every work order assigned to them, and the home dashboard's Happening today feed lists the work orders due today and carries over the overdue ones. On Growth and up, the contractor's bill is recorded as an invoice on the work order, which is the subject of Track Maintenance Costs per Property With Work-Order Invoices.
Recurring schedules, work orders, cases, and the contractor directory are on every plan, including Starter: free for the first 5 units, then $0.99 a unit a month. Growth is $99 a month for the first 50 units, then $1.49 per additional unit. The product summary is on the property maintenance software page.
Key questions
How often should preventive maintenance be done?
As often as each task's source says, which differs for every task on the schedule. Filters are a monthly check, and heating and cooling equipment gets a yearly service ahead of its season, by ENERGY STAR's guidance. Fire, elevator, and backflow inspections follow the cycles in your local codes. A schedule that gives every task the same interval is wrong for most of what is on it.
What is the difference between preventive and reactive maintenance?
Preventive maintenance is scheduled before anything fails; reactive maintenance is the repair after something does. A residential building needs both. A burned-out hallway bulb is cheap to fix when it fails, so it stays reactive. A boiler, a roof, a sprinkler system, and an elevator are expensive, regulated, or dangerous to lose, so their service goes on the schedule.
Does preventive maintenance save money?
Yes, over the life of the equipment, though no single percentage holds for every building. Canada Mortgage and Housing Corporation's operations manual for multi-unit residential buildings says regular maintenance prolongs the life of a building's most expensive systems and saves money over the long term. For a number of your own, compare a year of emergency repair bills with the cost of the service that would have come first.
Can I keep a preventive maintenance schedule in a spreadsheet?
Yes, and for a few buildings it is a sensible place to start. A spreadsheet holds the list well: the tasks, the intervals, and the next dates. What it leaves to you is everything after a date arrives: opening the job, telling the contractor, and recording that the work was done. It stays accurate for as long as one person keeps it.
Is there a template for a preventive maintenance schedule?
Yes: eight columns make a one-page template. They are the building, the task, the interval, the source of the interval, who does the task, the first date, the next due date, and where the proof is filed. Canada Mortgage and Housing Corporation's operations manual prints a longer worked example, its master operational checklist, with a row for each task and a column for each month.
How do I schedule seasonal maintenance?
Give each seasonal task a yearly date ahead of its season, not inside it. Cooling equipment is serviced in the spring and heating equipment in the fall, before contractors' calendars fill. Work that repeats within a season, such as mowing or clearing roof drains, runs weekly while the season lasts and is paused when it ends.
How do I know the preventive maintenance was actually done?
The closed job is the proof, so every task has to end as one. A finished job shows the date it closed, who did the work, and the service report, photo, or certificate attached to it. A job still open past its date is the list to follow up. Read that list every week, and the quarterly review becomes a reading of the record.